An operational history sits behind every financial claim.
A drilling contract may price work by stage, quantity, time or a combination of measures. The parties may describe the same period as performance, paid waiting time or contractor-caused downtime. The calculation therefore needs to be read alongside the site records.
We examine the contract with the work programme, daily reports, instructions and correspondence. We establish what was agreed, which enabling conditions the parties provided and how changes affected timing, expenditure and performance.
Disagreements we examine
Work or waiting time remains unpaid
The client disputes quantities, rates, the classification of particular periods or the basis for payment. We compare the calculation with the contract and original operational records.
Work has stopped on site
Possible causes include site readiness, missing resources, equipment failure or other contractors. We distinguish each period, the cause of the stoppage, notices and the ability to continue working.
Mobilisation and demobilisation are disputed
Personnel and equipment have moved, but the start is delayed, the scope changes or the contract ends. We examine instructions to mobilise, allocation of expenses and records of actual costs.
Claims follow operational complications
The parties connect additional work, delay or damage with technical events. We distinguish established facts, technical explanations and the contractual grounds for liability.
What we examine in a drilling contract
Payment terms and the recording of site events both matter. A final acceptance certificate alone may not explain the dispute.
- The pricing unit
- We examine rates, stages, quantities and the treatment of working and waiting time. We identify overlaps so the same period is not inadvertently counted in several parts of a claim.
- Enabling obligations
- Who was responsible for access, site readiness, materials, input data and approvals? We compare those obligations with actual dates and notices of obstacles.
- Operational records
- We examine the sequence of daily reports, logs, instructions and records. We identify inconsistencies, signatories’ authority and the timing of objections.
- Causes and consequences
- We separately examine an event’s cause, its effect on performance and the calculation of expenses. Technical processes and the causes of damage may require specialist investigation.
From site records to a legal position
- 01
Reconstruct the chronology
We divide the disputed period into readiness, arrival, commencement, stoppages, changed instructions and completion. Each event is linked to supporting records.
- 02
Check the calculation
We compare contractual rates with supported periods and quantities. We distinguish the contract price, additional work, expenses and penalties.
- 03
Examine objections
We assess allegations about quality, responsibility for downtime and compliance with instructions. Where needed, we formulate questions for a technical specialist or expert.
- 04
Prepare the position
We prepare a claim, response or court position. For continuing projects, we agree arrangements for recording new events and changes to terms.
Different sides of the contract
For drilling and service contractors
Substantiate completed quantities, the basis for paid waiting time and approved changes. Separately examine expenditure on mobilisation, maintaining resources and stopping work, without combining it with the ordinary contract price.
For oilfield service clients
Check whether claimed quantities match the assignment, why stoppages occurred and whether additional charges are justified. Prepare specific comments and defect claims supported by operational data.
Which documents help us assess the matter
- Contract and programme
- The contract, technical assignment, work programme, rates, timetable, amendments and enabling obligations.
- Shift and daily records
- Daily reports, operational logs, downtime records, instructions and confirmation of their receipt.
- Movement and readiness
- Mobilisation requests, arrival records, site handover, access, transport and removal documents.
- Accounts and disagreements
- Acceptance records, time and expense calculations, payments, objections, claims and correspondence about changes.
For the first enquiry, a brief description of the parties, amount, stage and urgent dates is enough. Detailed documents are shared after a conflict check and agreement on how we will work. An NDA can be agreed on request.
What the engagement can include
- A chronology of disputed periods with supporting records, causes of stoppages and allocated contractual responsibilities.
- A reviewed calculation of claims and technical questions relevant to the legal assessment.
- Pre-action or court documents, or contractual arrangements for continuing work, within the agreed engagement.